Excellence Awards 2026: The Eurovision Song Contest 2026

Project Type

Concert (Arena/Theater, primary venue capacity under 20,000) 
 

Project Name

The Eurovision Song Contest 2026.  

A live, international television special featuring more than 30 acts and broadcast by over 130 million viewers. Creative and show director Michael Schwandt,Inc for the client, the EBU (European Broadcasting Union), Eurovision & ORF (the host country Austria’s network). Eurovision Song Contests average more than 130 million viewers each year. 

Design Criteria

 
This performance was wrapped around the Flag Parade of the top 25 nations. Additionally, very complex Grand Final guest artist performances by Parov Stelar, Cesar Sampson & the 70th Anniversary of Eurovision All-Stars performance featuring 10 previous winners. Opening & all guest artist performances in Semi-Finals 1 & 2 were also part of this scope for the project. 

 

Project Description

 
The project was to create performances across all three telecasts: 
  • Grand Final 
  • Semi-Final 2
  • Semi-Final 1.  
They included the Grand Final Opening Ceremony featuring last year’s winner, JJ, in a Classic Opera, turned Opera Ball, turned Vogue Ball turned Opera Rave featuring the Vienna Orchestra. 
 

Challenges and Solutions

 
The Stadthalle venue in Vienna is a concave roof, so the lowest point is actually the center of the room where everything needs to live. This presented several logistical challenges for lighting & rigging with reduced weight capacities. The stage & runway took up the entire width of the arena from end to end which makes it a vast area to cover but also make the production design much more immersive & engaging for the audience b/c at some point everyone has a great viewing experience. 
The biggest challenge was time, you are competing for time with every country that is also performing in the show, sharing resources. There is a contest team which is representative of these entries & then the show team that is responsible for putting on all non competitive performances & the show itself. As with all projects, everyone is clamoring for time but this project is on another level when it comes to sharing the space. 

The Stadthalle was the binding constraint. It is an older, city-owned hall with suspended ceilings, ventilation plant and limited rigging points all fighting for the same overhead space. The roof slopes inward, so the lowest clearance — about 15m — sits exactly where the show needs the most height - the building itself the biggest challenge.

Designer Florian Wieder’s concept — a curved “leaf” infinity screen, a sound-wave passerelle (or walkway), and a golden “construct” — had to be built around those limits and around Eurovision’s rules. Between the 35 competing acts the stage had to reset in about 40–42 seconds while the postcard played. Props are weight-capped (no grand pianos), and competing performances are limited to six people on stage. Two camera tracks ran through the deck, splitting it into three islands with only about 40 mm between them, plus a “peek-a-boo” lift that could travel 8m. The Green Room sat opposite, linked by a catwalk that looped the floor and climbed into the roof like a rollercoaster, so hosts and the winner’s walk were always crossing the same geometry the acts were using. Build and strike were equally tight: about 2,000 m² and 210 tons of stage in under two weeks.

In total there was an Opening Ceremony, a Flag Parade, 3 guest artists acts in the grand finale, 2 guest artist acts in the SemiFinal 2 & 3 guest artist acts in the SemiFinal 1 that had to sit inside Wieder’s leaf, passerelle and infinity wall, under about 15 m of clearance at centre, on a deck already cut by camera tracks.

All in all we worked with 20 different artists (some bands), 40 dancers, 6 aerialists, a 48 person acrobatic troupe, a 60 person choir & a 55-piece orchestra.

Equipment

This was the first ESC lit entirely with LED and laser sources: about 2,100 fixtures and more than 8,500 individually controllable LEDs, no conventional lamps.

The roof forced the signature move. Traditional moving trusses would have been too heavy and would have blocked the clean infinity screen, so the overhead budget went into 80 individual Kinetic Lights Winch XL units, each carrying one fixture (Ayrton Rivale Profiles in the final rig) with a gyroscope. Payload was tight — the winch’s useful capacity sat around 35 kg, and the fixture plus gyro nearly filled it. Every lamp could fly on its own at about 1.5 m/s, with live XYZ data back to the console so a beam could stay locked on a point while the fixture moved. That is far harder to load-monitor than flying a whole truss, and it is what the low roof bought them.

Team

Creative & Show Director - Michael Schwandt (Michael Schwandt, Inc.)

Production Designer - Florian Wieder (Wieder Design)
Set Designer - Cuno von Hahn (Wieder Design)
Lighting Designer - Tim Routledge 
Associate LDs - Morgan Evans & James Scott
Programmers - Alex Mildenhall, Martin Higgins & Marc Nicholson
Video Content - Falk Rosenthal  (Gravity)
SFX - Melanie Cagnon (Ignition Concept)
Asst Stage Director - Marco Da Silva 
Choreographer - Ferly Prado 
Choreographer & Aerial Choreographer- Johanna Sapakie 
Asst Choreographer - Taylor Thomas 
Costume Designer - ZiZi Bohrer-Lehner 
Music Director - Dorothee Freiberger
Producers - Susanne Wiesner, Lukas Anger, ChrisStein 
Production Manager - Luke Halls
Camera Director - Robin Hofwander