HSL Rigging Totem Tower 2T-V

HSL’s Rigging team has designed a strong and versatile tower capable of lifting loads up to 2 tons, complete with a small, neat footprint. The 2T-V was developed with very fast build times in mind, as the Tower takes only 2.5 hours to build with a crew of one HSL Rigger and four local crew members . The tower can be taken down in 1.5 hours.

Register to view the full article

Register for livedesignonline.com and gain access to premium content including production and design materials, videos, and more.

Hide comments

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish