PRG's Chris Conti, who was lighting systems tech and the lighting network designer for the Pepsi Super Bowl LII Halftime Show featuring Justin Timberlake, shared the complex lighting network system diagram for Bob Barnhart's lighting design.
Click here to enlarge the view.
Lighting Team
Lighting Designer: Bob Barnhart
Lighting Directors: Dave Grill, Peter Radice Jason Rudolph
Assistant Lighting Directors: Vicky Corbalis, Harvey Fitzpatrick
Lead Gaffer: Tony Ward
Gaffers: Keith Berkes, Dean Brown, George Clayton, Joe Faretta
Best Boy: Jose David Serralles
Network Designer/Systems Tech: Chris Conti
PRG Project Manager/Lead Tech: Robert Minnotte
PRG Lead Techs: Jeff Anderson, Matt Geneczko, Patrick Brazil
Spot Operators: Timothy Altman, Paul Bell Jr., George Sennefelder, John Warburton
Arch Light Tech: Quinn Smith
Drafting: Ben Green
Fiber Tech: Alex Ward
28 Local 13 I.A.TS.E.
Check out more Halftime Show coverage, sponsored by All Access Staging and Productions.