Theatre Is A Beach

I just thought I would post a cool time-lapse video I took of the theatre crew loading in 5.5 tons of wet sand for our beach setting in Twelfth Night. Unfortunately it rained the night and day of the delivery. The load in actually only took about 25 minutes thanks to this amazing dump truck that had a conveyor belt that could shoot the sand up to 44 feet away. One thing about wet sand is, once you turn the lights on to try and dry it, the theatre becomes a self contained green house…ugh. Loading out will take a long time, but at least the load-in went well.

5 Tons of Sand

(Click, It Will Open a New Window)